Wake Electric wants to remind you to dial 8-1-1 at least three working days before beginning a digging project. This free, simple step can save lives and reduce risk of injury, repair costs, fines and inconvenient outages.

According to North Carolina 811, an underground utility line is damaged every nine minutes because someone decided to dig without first having underground lines marked. The depth of utility lines can vary for a number of reasons, such as erosion, previous digging projects and uneven surfaces, and the risk of striking a utility line exists even when digging only a few inches.

The national 811 “Call Before You Dig” phone number links residents to a local one-call center, which then notifies local utility companies to send out locators to mark underground lines with paint or flags. These marked lines indicate where it is—and isn’t—safe to break ground.

Once lines have been marked, make sure to dig carefully around the marks, not on top of them. Also, because utility line locations can shift, it’s important to call 811 before each digging project.

Learn more about safe digging.

Call before you dig