1,471 (13.5%)
Poles Identified for Replacement
25,989
Meter Locations Inspected and Readings Verified
40.57
Miles of Overhead / Underground Wire and
Cable Added or Replaced
10,891
Poles Inspected and Tested
207,484
kWh Used for. Electric Vehicles
1,075,000
Outage Minutes Saved by Self Healing Grid (8 Events)
233
SunPath Community Solar Panels Subscribed to 41 Members
2025 Substation Improvements
- Completed the bus replacement and regulator addition project at Spero Substation to increase the substation capacity.
- Oil testing and dissolved gas analysis completed on 24 substation transformers and 90 substation and feeder regulators.
- Maintenance change-out of 9 substation and feeder voltage regulators and 80 substation and feeder reclosers.
- Completed inspections of field equipment on distribution lines, including 40 voltage regulators,
47 capacitor banks and 50 reclosers.